Santa Isabel – Mexicali transmission line.
161 kV. 0.20 km-line.
Installation of underground circuits in a power cable system for 161 kV (XLPE, copper and cross section of 1200 mm2 per phase).
Transmission line Camino Real Entq. Punta Prieta II – El Triunfo.
115 kV. 0.30 km-line.
Installation of underground circuits in a power cable system for 115 kV (XLPE, copper and cross section of 1000 mm2 per phase).

 

DETAILED SERVICES
Electromechanical and civil detailed engineering of the underground sections of the lines.