WORKS
New GIS Berlin substation and Brick factories 115/13.8 kV.
San Roque 115/13.8 kV Substation extension.
Berlin Entq. Transmission Line Monterrey – Bridges. 115 Kv. 1.8 km-line.
Circuit installation in aerial and underground sections. Laying of 3 km of guard cable with optical fibers in existing line.
Transmission line Brick Factories Entq. Fundidora – Technological 115 kV. 0.90 km-line. Installation of circuits in aerial and underground sections.
Laying of 9 km of self-supporting dielectric cable with optical fibre (ADSS).
DETAILED SERVICES
Electromechanical and civil detailed engineering for each substation and line.
On-site technical office.
Management with final customer (CFE).
Detailed engineering in substations and lines in Mexico
Client_ Mondisa