WORKS
Expansion of substation Bacum Bcos 3 and 4 + MVAr. 400/230 / 34.5 kV. Two transformation banks of 6 single-phase autotransformers of 125 MVA. Three feeders in 400 kV for Transmission Lines and one 400 kV power reactors bank composed of 4 banks of 25 MVAr each and one neutral reactor.
Choacahui substation extension. Feeder in 400 kV.
Empalme substation extension. Four feeders in 400 kV for transmission lines. Four feeders in 400 kV for the interconnection of this installation with the CC Generation Empalme II units. Design of power cable gallery for seven underground circuits in 400 kV.
Extension of substation Seri Bcos. 1 & 2. 400/230/34.5 kV. Two transformation banks of 6 single-phase autotransformers of 125 MVA and one back-up unit. Two feeders in 400 kV for transmission lines.
DETAILED SERVICES
Civil detailed engineering and electromechanical of substations.
Energy
Engineering
__
Detailed engineering of substations.
Client_ Acciona