WORKS:
Substation Lifters 115/13.8 kV. 115 kV feeder that will link the installation with El Pilar distribution substation.

18/24/32 MVA transformer.
Evacuation Line. 115 kV. 4 km-line. Circuit installation in VOLTAE-design self-supporting towers under Mexican and international regulations.
Expansion of substation El Pilar 115 kV. 115 kV feeder for the transmission line that will link this substation with the elevator substation of the photovoltaic plant Energía Limpia de la Laguna.

DETAIL OF SERVICES:
Basic engineering.
Electromechanical and civil detailed engineering of the line and substations.