Avant Solar 30 MW Photovoltaic Plant Interconnection (Camargo) in Chihuahua
Avant Solar 34.5/115 kV substation
Evacuation line 115 kV SC Avant Solar –Camargo II
Extension Camargo II 115 kV CFE Substation
Solem I/Solem II Photovoltaic Plant Interconnection (150 MW/140 MW) in Aguascalientes
Substation lifter Solem I 34.5/230 kV – 155 MVA
Substation lifter Solem II 34.5/230 kV – 166 MVA
Evacuation Line Solem I 230 kV
Evacuation Line Solem II 230 kV
Substation Manoeuvres 230 kV CFE
Junction line 230 kV CFE
Interconnection of the Photovoltaic Plant Energía Limpia de la Laguna (30 MW) in Durango
Substation lifter 34.5/115 kV 32 MVA
Evacuation line SC 115 kV
Expansion of substation El Pilar 115 kV CFE
Interconnection of Andalucía Photovoltaic Plant (100 MW) in Coahuila
Substation lifter 34.5/230 kV 106 MVA
Evacuation line 230 kV SC
Andalusia Substation Extension
Bluemex Power Photovoltaic Plant Interconnection (110 MW) in Guaymas
Substation Lifter 34.5/115 kV 110 MVA
Transmission line 115 kV DC Junction Empalme-Guaymas
115 kV Manoeuvres Substation
Interconnection of Potosí Solar Photovoltaic Plant (300 MW) in San Luis Potosí
Substation lifter 34.5/400 kV 300 MVA
Evacuation Line 400 km
400 kV Manoeuvres Substation
400kV CFE junction line
Transmission line Primero de Mayo – A3J70 – Cañada 400 kV DC (Transpositions)
Interconnection of Trompezón Photovoltaic Plant (126 MW) in Aguascalientes
34.5/115kV Lifting Substation.
Evacuation Line 115 kV 8 km.
Extension of Aguas Calientes Substation. Power 115 kV CFE.
Interconnection of Villa Ahumada Photovoltaic Plant (150 MW) in Chihuahua
Substation lifter 34.5/230 kV.
Evacuation line 230 kV 3 km.
Expansion of substation Moctezuma 230 kV
Interconnection of Tepeyehualco Photovoltaic Plant (100 MW) in Veracruz
Substation lifter 34.5/115 kV.
Evacuation line 115 kV 30 km.
Expansion of subestación Perote II 115 kV.
Pachamama Photovoltaic Plant Interconnection (300 MW) in Aguascalientes
Substation lifter 34.5/400 kV 300 MVA
400 kV Evacuation Line
400 kV Manoeuvres Substation
400kV CFE junction line
Interconnection of Potreros Photovoltaic Plant (270 MW) in Jalisco
Substation lifter 34.5/400 kV 270 MVA
400 kV Evacuation line
400 kV Manoeuvres substation
400kV CFE junction line
Interconnection of PS Aguascalientes Sur I Photovoltaic Plant (29.7 MW) in Aguascalientes
Substation lifter 34.5/115 kV.
Evacuation line 115 kV 0.4 km.
Substation expansion. Aguascalientes Power 115 kV.
Energía
Consultoría
__
Voltae references in technical-administrative management for the interconnection of the generation plant to the electrical system. The objective is the fulfilment of all the requirements of the manager of the electrical system, transporter / distributor, as well as the current regulations.