WORKS:
Solem I and II Lifting Substation 230/34.5 kV.
165 MVA transformer.
230 kV feeder for the transmission line that links this installation with the Alten Manoeuvres substation.
Evacuation line. 230 kV. 6.0 km-line.
Installation of a circuit in self-supporting towers with VOLTAE-design under Mexican and international regulations.
230 kV manoeuvres.
Feeders in 230 kV for the transmission lines that link this installation with the substations Aguascalientes Oriente, San Luis Potosí I and Solem I and Solem II elevators.
Manoeuvres Substation Aguascalientes Oriente – San Luis Potosí I Junction. 230 kV. 0.50 km-line.
Installation of a circuit in self-supporting towers with VOLTAE-design under Mexican and international regulations.
Laying of 22.7 km of guard cable with optical fibers on existing line.

DETAIL OF SERVICES:
Civil, structural and electromechanical detailed engineering of lines and substations.
Technical office.

Contact Us

We are qualified professionals that successfully undertake “best cost” engineering projects that rely on in-depth knowledge.

Contact us

Ask our team

form

Work at Voltae

Want to join our team?

send cv

LinkedIn

News in our social channel

visitar