WORKS
New Culiacán Poniente Substation (400 kV) and Tres Ríos Substation extension (115 kV).
Transmission line Culiacán – La Higuera. 400 kV. 0.40 km-line. Circuits in self-supporting towers. Laying of 1.2 km of guard wire with optical fibers in existing line.
Transmission line Culiacán – Navolato. 230 kV and 115 kV. 14.70 km-line. Circuits in self-supporting towers and trunk-conical posts.
Transmission line Culiacán – PI Culiacán Uno. 115 kV. 16.5 km-line. Circuits in towers and self-supporting posts.
Transmission line PI Culiacán Uno – Tres Ríos, 115 kV. 1.40 km-line. Underground circuits in new and existing ducts banks.
Transmission line PI Culiacán Poniente – PI Culiacán Poniente, 115 kV. 5.3 km-line.
Installation and laying of circuit in towers and self-supporting posts.
DETAILED SERVICES
Electromechanical, civil and structural detailed engineering for transmission lines and substations.
Detailed engineering of the substation and compensation of the Northwest (3rd phase) in Mexico.
Client_ Grupo Ortiz