2016
ES PV * 200 MWac

2017
ES PV * 500 MWac
ES PV * 400 MWac
ES PV * 90 MWac
ES PV * 270 MWac
ES PV Solem I (Aguascalientes) 150 MWac
ES PV Solem II (Aguascalientes) 140 MWac
ES PV Avant Solar (Chihuahua) 30 MWac
ES PV * 400 MWac
ES PV * 200 MWac
EE and compliance with PV network code of Energía Limpia de la Laguna (Durango) 30 MWac
ES PE * 131 MWac
ES PE * 88 MWac

2018
ES PV * ≥200 MWac
ES PE * ≥ 300 MWac
ES Photovoltaic Plant * ≥250 MWac
ES PV * ≥100 MWac
ES and compliance with PV network code Mexsolar I, 30MW.
ES and compliance with PV network code Mexsolar II, 30MW.
ES and compliance with PV network code Bluemex, 100MW.
ES and compliance with PE code San Matías, 30MW.
ES PE, 300 MW.

2019
ES and compliance with PV network code Tepeyehualco, 100 MW.
ES and compliance with PV network code Aguascalientes Sur 1, 30 MW.
ES and compliance with PV network code Andalucía II, 82.5 MW.
ES and transpositions PV Potosí Solar LT May Day – A3J70 – Cañada 400 kV Double Circuit.
ES for change Reactors Substation Potosí Solar Manoeuvres.

ES> Electrical Study

* Some data of project situation are confidential.

Contact Us

We are qualified professionals that successfully undertake “best cost” engineering projects that rely on in-depth knowledge.

Contact us

Ask our team

form

Work at Voltae

Want to join our team?

send cv

LinkedIn

News in our social channel

visitar